Design and Installation Process


1. Assessing Your Needs

The first step is to meet with you at your house to discuss your needs & your desires for your home. What do you love and what do you hate in your existing space? How do you use your bathroom or kitchen? What is the traffic flow of the rooms? These and other questions become part of our conversation. We will also take rough measurements, digital photos and create a rough layout for the room(s). This meeting usually takes about an hour and we will provide you with a rough estimate of the cost, timing and project duration, based on the concept.


2. Creating a Detailed Floor Plan & Elevations

If you like what you hear in step one, the next step is to design a detailed floor plan of the project. There is a design fee at this point. The fee is based on the room(s) being designed and is between $1,000 - $1,500 per room. Along with this floor plan, you will also receive an elevation view and layout of your kitchen and a detailed Job Estimate. (View Link for the elevation and perspective view on the kitchen shown to a customer).


3. Agreements & Timing

After reviewing your Elevations, Room layout and Job Estimate and upon deciding to contract our company to work for you, we will then write up the necessary contracts. These include the Proposal, Certificate of Capital Improvement and the Cancellation Notice, all of which you will need to sign. If anything needs to be changed from these contracts an AWA (Additional Work Authorization) will be signed by you before we can change the plan.


4. Finalizing Selections and Ordering Cabinets

The next step is to finalize your selections. There are many decisions that need to be made and we can walk you through the process with our in-house designer to help make the best choices. Once the selections are finalized, we order your cabinets. After ordering, the cabinets typically take 8-12 weeks to be delivered. All of our cabinets are custom made and the cabinet order is confirmed twice before the cabinets are created to make sure they meet all the necessary specifications. (View Link for selection sheets)


5. Details, Details, Details…

In the time the cabinets are being produced, all of the other details are taken care of. Purchase Orders are placed for everything that will be used in your kitchen. These can include everything from countertops and tiles to sheetrock and lumber. This preparation time is critical so that when the cabinets arrive, everything is ready so that we can get right to work.


6. Construction and Installation

The final step is installation of the cabinets. Depending upon the amount and degree of construction needed, this will typically take four to eight weeks. After that, you can begin using your new and improved kitchen or bath.